My company has chosen the label “Completed” for the status of an action.
I now want to use the battery widget on dashboards.
The battery widget starts with a visualization 0% Done. I have learned i can control the Word done and change it to whatever i want.
How do i tell the widget which label equates to Done / Complete?
Is the widget hard coded to look for status ‘Done’?
If i cannot control this within the widget, is the solution really that i have to go to every single board and action and change the status from Completed to Done?
Which labels are considered as “done” for a status column is controlled by going into the status column settings/Customize status column. There will be a list of the different label colors at the bottom. The ones that have a check mark are considered “done”. You can change them by clicking on them.