I see a lot of people asking for subtasks and what I want is not quite that. I am unsure if I’m using the Link and Mirror columns incorrectly.

I have a high board (strategic projects) and low board (tactical work items) and I was thinking I could use the Link function to establish a “bi-directional link” - a Link column on each board, linking to the other. The thought is that when someone is adding a tactical item, one of their columns would be to choose the strategic item it rolls up to. In doing that, back on the Strategic board, the “list of items” is automatically populated by the choices made on the tactical board. i.e, you could start to see all the down-level tactical items associated with that strategy.

In actual practice, I can make a link column (with mirror) on both sides, but they seem to operate independent of each other. The tactical board lists a strategy, but then I can go to the strategy board and see it’s blank (mirror column of status I’m pulling as well as “0 items”) and then I can select a completely independent set of tactical items on that same strategy.

Am I making sense / doing something wrong / trying something the tool isn’t capable of?

3 Likes

Hi @Idolwild, I can very much relate to your wish of being able to create a workflow like you describe. In fact i described somewhat of the same in Two-way linked with 'Link To Item' column (potential subtask solution)

Another usecase for me would be working on one high level planning board and connect items (tasks) from another board via two-way LTI column.

Cheers,
Eltjo

2 Likes

Hey @Idolwild - welcome to the community! Currently the link to item column, indicates when you connect one item from one board to an item(s) to another board - the only thing it actually does it create that first set of linking and shows they are linked, though no changes will be made without the use of the Mirror column or automations.

Would you mind elaborating a bit further on how you would expect the linking/roll up feature to work? We are in the process of working on changes to the mirror column to allow for rollups, one to many boards, etc.

Let me know!

1 Like

@brett-monday.com: I think it’s probably best if I just illustrate it using my real-world boards. Please keep in mind – I might still be using the field types incorrectly, so please excuse if this is already possible and I’m just doing something wrong.

I have the following HIGH-level board that lists out the projects one of my teams is working on. It has the fields below – you can see I’ve added a mirror/link column set to look at my LOW-level sprint board with tactical items. For any given project, I can associate a number of pulses from the sprint board, in any sprint grouping. The below is the interface provided:

This interface is OK and serves the purpose of associating down-level tactical work with the project. However, instead of doing the spec from top-down, why not bottom-up?

This is the board with my tactical items and its associated columns. We use one-week sprints, each sprint is a group, the top-most being the current week’s sprint. My people are on this board all day long, putting in their work and maintaining their workflow at the tactical level. Sometimes they need to break items apart, sometimes consolidate, sometimes they need to put new work in.

For any given pulse they enter, I want them to associate it with one of our projects on the HIGH-level board – each item is, after all, a child of one of those parents. What I want to have happen is that when they DO select the project that the tactical pulse is associated with, it essentially would be the same end result as if I had checked the box next to that pulse at the higher level (the action specified in the second paragraph). That way, my people can be responsible for associating their work to a project when they enter it, instead of us having to filter through the projects, one at time, and then looking through the sprints for the work. I hope that makes sense!

Please let me know if I can elaborate further.

Hey @Idolwild - thanks for explaining here. To me it sounds like you are using a high level board with the link column to link to all of your lower level boards.

Would you be willing to do it the opposite from your current set up? Can you clarify on linking from your low level boards to your high level board would not work for you? Currently the mirror column is set up so that you can only link one board to another per column, whereas the link column you can link one to many.

Does that make sense? Would you be willing to use it from low to high?

Brett

I don’t really understand what you mean. Wherever you establish a link/mirror, the point is activity is not bi-directional reflected between boards. I can associate each sprint item with a project, but on the project board I would never know this occurred. Either that or the software is just confusing.

@brett-monday.com - Ya, after some looking around, the things this person expresses in this post:

Are accurate, and my current challenge is described as “monday offers a very limited view of linked/mirrored relationships. The only way to see a linked relationship is to be on the linked board . If you are on the parent board, there’s no way to see an overview of the links.”