Dashboard - Using Workload widget to identify Production Area?

Hi All,

I’m currently rolling out monday.com across my site and I’m running into an issue with the Workload widget on my main Site dashboard.

I’m trying to use the widget to show the Production Area where a task is assigned (rather than the individual responsible). I’m able to set the X/Y axes correctly, but I’m finding that my Production Areas are appearing multiple times in the widget.

A few things I’ve already checked:

  • The Production Area column is a managed column and is used consistently across all connected boards (reconfirmed multiple times).

  • There are no duplicate labels, no subtle spelling differences, and nothing extra hidden in the dropdown.

  • I’ve attached a screenshot of how it’s displaying in the widget.

With that in mind — am I setting something up incorrectly, or is this simply a limitation of the Workload widget when grouping by a managed column across multiple boards?

(I know I could use another calendar‑style widget, but the Workload widget is definitely easier on the eyes 😄)

Thanks in advance!

3 replies