I keep getting an error message when trying to assign a subitem to another subitem’s dependency column. It says “The changes don’t match column settings.” I have changed the dependency column settings between “flexible,” “strict,” and “no action” and checked that the Due Date column is linked. What other settings do I need to check and how do I find them?