I want to set up either a formula or automation which uses the planned timeline to give me a date based on a percentage in another column.
For example if the planned timeline is 08/04/2025 to 07/02/2025 and the % in the columns if 10% I would like it to return 08/05/2025 as that is 10% into the project.