WIP limit in status column (Kanban)

Hello!

Excellent product, congratulations. Is there a particular way to add a WIP limit to the Kanban columns? I couldn’t find anything related here nor in Google, and it’s a key feature, in my opinion.

Best.

Alex

Do you mean limit the amount of WIP that can be assigned to each person each week? That is available via the Workload view (would be good to have that as a standard on each board).

For me, this would be how much work could be assigned to each column (status) in the kanban view. WIP is a core principal of kanban boards.

Even if you could have the option to show the wip limit at the top - this would be a big help. As it is now, I’m having to change the names of the statuses.

1 Like

Hi Holly, I’m having the same issue here, did you find a solution to the WIP limits in the kanban view?

No, only to tag it into the title of the column, but doesn’t work great.

Thanks for your reply Holly, let’s hope monday adds this useful feature! Have a good one