Hi,
Is it possible to point the overview widget to use the groups as different projects to reference the “progress”?
If not, can you think of a way to visualize this?
I have X groups, with a variable number of items within, built out of the timeline, status, and numeric “progress value”,
And I want to provide the user with a visualized snapshot of where each group stands, rather than the entire board.
Any thoughts would be welcome