Workload between assigned team members on same pulse is not reality of a 50/50 split

I would like to be able to divide the workload of assigned team mates within the same pulse by actual hours that they are required. Right now the LOE can only be divided in half. This is not reality and inaccurate for LOE when the team is assigned.

There is also a discussion that was opened on this: Workload Time Per User - Time Estimates

This would be a great asset to me and my team members!